{"page":{"id":473,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://spurly.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-17\">November 17, 2026</time></p>\n<p>Plans change during rodeo season. A friend drops out of the bachelorette trip, you realise you typed the ranch name the long way, or you want the hoodie in a bigger size to wear over a tucked tee. This page explains how to cancel or change a Spurly order, how long you have, what can be changed and what happens once printing has started.</p>\n<section class=\"policy-summary\">\n<h2>Cancellations and changes at a glance</h2>\n<ul>\n<li><strong>Window:</strong> cancel or change within 24 hours of placing your order.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@spurly.shop\">support@spurly.shop</a> with your order number and exactly what you need.</li>\n<li><strong>What can change:</strong> sizes, designs, quantities, names and ranch text, brand letter and style, and the shipping address.</li>\n<li><strong>Cancelled orders:</strong> refunded in full to the original payment method.</li>\n<li><strong>After 24 hours:</strong> email us anyway and we will tell you what is still possible.</li>\n<li><strong>Already delivered:</strong> use our 60-day returns with a free return label; the refund is issued within 7 days of receiving the return.</li>\n<li><strong>Support reply:</strong> within 24 hours on business days.</li>\n</ul>\n</section>\n<h2>1. Why the window is 24 hours</h2>\n<p>Every Spurly piece is printed to order. Processing, meaning printing and packing, takes 1–3 business days, and it begins soon after you order. There is no proof step before production: we print exactly what you type, and the product page shows a live text preview of your text on the product photo before you add it to the cart. That is why the time to fix a typo, swap a size or cancel is the first 24 hours after you place the order. Once a name is printed on a tee or a tumbler, it cannot be unprinted.</p>\n<p>The 24 hours count from the time on your order confirmation email, around the clock, including weekends. Our reply time is 24 hours on business days, but the window depends on when you send your request, not on when we answer it. Send your email inside the window and say what you need in that first message.</p>\n<h2>2. How to cancel or change an order</h2>\n<ol>\n<li><strong>Find your order number.</strong> It is in your order confirmation email and, if you have an account, in <a href=\"/my-account/\">My Account</a>.</li>\n<li><strong>Email us.</strong> Write to <a href=\"mailto:support@spurly.shop\">support@spurly.shop</a> or <a href=\"/submit-ticket/\">submit a ticket</a>. Use the subject &#8220;Cancel&#8221; or &#8220;Change&#8221; followed by your order number.</li>\n<li><strong>Say exactly what you need.</strong> For a change, write the old value and the new value, for example: &#8220;Line 3, name: change Josey to Josie.&#8221; For a cancellation, say whether it is the whole order or specific lines.</li>\n<li><strong>Wait for our confirmation.</strong> We reply within 24 hours on business days. Your change or cancellation is done once you have our confirmation email.</li>\n</ol>\n<p>Please send everything in one email where you can. Several separate emails about the same order are harder to match up and can slow things down.</p>\n<h2>3. What you can change within 24 hours</h2>\n<table class=\"policy-table\">\n<caption>Changes you can request within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Example</th>\n<th scope=\"col\">What to write</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Size</td>\n<td>A sweatshirt from M to L for an oversized fit</td>\n<td>The item and the new size</td>\n</tr>\n<tr>\n<td>Design or colour option</td>\n<td>Rocking S tee swapped for the Flying B design</td>\n<td>The item now and the item you want</td>\n</tr>\n<tr>\n<td>Ranch name or custom text</td>\n<td>&#8220;Double Creek Ranch&#8221; changed to &#8220;Dbl Creek&#8221;</td>\n<td>The exact new text, letter for letter</td>\n</tr>\n<tr>\n<td>Brand letter or style</td>\n<td>Rocking S changed to Lazy J</td>\n<td>The new letter and the style name</td>\n</tr>\n<tr>\n<td>Bride name, city, est. year or back line</td>\n<td>Bride name corrected on a crew tee</td>\n<td>Which cart line and the new text</td>\n</tr>\n<tr>\n<td>Quantity or lines</td>\n<td>Removing two crew tees from a set of eight</td>\n<td>Which lines to remove or add</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Adding a missing apartment number</td>\n<td>The full corrected address</td>\n</tr>\n</tbody>\n</table>\n<h3>Changes that affect the price</h3>\n<p>Some changes change the price. Moving a tee into 2XL or 3XL adds $2, and 4XL or 5XL adds $4. Adding the optional back line adds $5, and removing it takes the $5 away. When a change affects your total, we explain the difference in our reply and how it will be handled before we make the change.</p>\n<h3>Text that will not fit</h3>\n<p>Each personalised field shows a character limit next to it. If your corrected ranch name is longer than the limit, shorten it the way brands are often read: &#8220;Co.&#8221; for &#8220;Company&#8221;, &#8220;&amp;&#8221; for &#8220;and&#8221;. Send us the shortened version so we can apply it exactly.</p>\n<h2>4. Worked examples</h2>\n<h3>The ranch name noticed three hours later</h3>\n<p>You typed &#8220;Double Creek Ranch&#8221; in the ranch name field, but the family brand has always been read as &#8220;Dbl Creek&#8221;. You notice three hours after ordering. You are inside the 24-hour window, so email us with your order number and the new text. We confirm the change, and the shirt is printed with &#8220;Dbl Creek&#8221;.</p>\n<h3>Rocking or Lazy?</h3>\n<p>You picked &#8220;Rocking S&#8221;, which shows a curve under the letter, but your family brand is a letter lying on its side, which is &#8220;Lazy&#8221;. The live preview on the product photo shows each style before you order, so check it there first. If you already ordered and are within 24 hours, email us the correct style and we will update it.</p>\n<h3>Two friends drop out of the last-rodeo weekend</h3>\n<p>You ordered eight Last Rodeo crew tees, one cart line per name. Two friends cannot come. Within 24 hours, email us the two names to remove. We remove those lines and refund them to your original payment method. The other six are printed as ordered.</p>\n<h3>Ordered the wrong size, noticed the next morning</h3>\n<p>You ordered a hoodie in M late at night and realise the next morning you wanted it oversized. If it is still within 24 hours of the order time, email us asking for L or XL. If the window has passed, see section 6.</p>\n<h2>5. Cancelling an order and your refund</h2>\n<p>You can cancel all or part of an order within 24 hours of placing it. When we confirm the cancellation, we refund what you paid for the cancelled items to the payment method you used at checkout. Shipping is free on every order, so there is never a shipping fee to recover, and there is no cancellation fee.</p>\n<p>Once your bank or payment provider receives the refund, it posts it to your account on its own schedule. If you do not see it after a reasonable time, email us with your order number and we will help you trace it. All details on refund amounts and store credit are on our <a href=\"/refund-policy/\">Refund Policy</a> page.</p>\n<h2>6. After the 24-hour window</h2>\n<p>After 24 hours, your order may already be printed and packed, and personalised pieces may already carry your text. Email us anyway with your order number and what you need. We will tell you what is still possible for your order.</p>\n<p>If the change cannot be made and your order is delivered as placed, you still have our returns:</p>\n<ul>\n<li><strong>Standard items:</strong> return within 60 days of delivery with a free return label. Your refund is issued within 7 days of receiving the return, to your original payment method, or you can choose store credit that never expires.</li>\n<li><strong>Personalised items printed as you typed them:</strong> contact us first and we will tell you what we can do.</li>\n<li><strong>Damaged, misprinted or wrong items:</strong> fixed at no cost, with a reprint or a refund, as support arranges.</li>\n</ul>\n<p>The full process is on our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> page.</p>\n<h2>7. If your order is already on its way</h2>\n<p>Once a parcel has left, it cannot be cancelled in transit. Accept the delivery and start a return within 60 days if you need to. If you need the address changed on a parcel that has already left, email us with your order number and the correct address and we will help with what can still be done. Delivery times and tracking are explained on our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page.</p>\n<h2>8. When Spurly cancels an order</h2>\n<p>Occasionally we may need to cancel an order ourselves, for example if a product cannot be made as ordered, the text in a personalised field cannot be printed, or the shipping address is outside the United States, Canada, Australia and New Zealand. If that happens, we email you to explain and refund the full amount you paid to your original payment method. Where it helps, we suggest a similar design you can order instead.</p>\n<h2>9. Checklist before you order</h2>\n<p>The easiest change is the one you never need. Before you place an order, read your cart out loud like a brand call at the sale barn:</p>\n<ul>\n<li>Every name and ranch name is spelled the way the family spells it.</li>\n<li>The brand letter and style match the live preview.</li>\n<li>Each crew tee is its own cart line with the right name and size.</li>\n<li>Sizes are checked against the <a href=\"/size-guide/\">Size Guide</a>, sizing up one for an oversized fit.</li>\n<li>The shipping address includes the apartment or unit number and the right ZIP or postal code.</li>\n<li>You have left enough time: 1–3 business days of processing plus 7–14 business days of transit.</li>\n</ul>\n<h2>10. Timeline of what can change, and when</h2>\n<table class=\"policy-table\">\n<caption>Order stage and what you can do at each stage</caption>\n<thead>\n<tr>\n<th scope=\"col\">Stage</th>\n<th scope=\"col\">Cancel</th>\n<th scope=\"col\">Change text, size or address</th>\n<th scope=\"col\">Your next step</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Within 24 hours of placing the order</td>\n<td>Yes</td>\n<td>Yes</td>\n<td>Email us with your order number and the exact change</td>\n</tr>\n<tr>\n<td>More than 24 hours after ordering, not yet delivered</td>\n<td>Ask us</td>\n<td>Ask us</td>\n<td>Email us; we will tell you what is still possible</td>\n</tr>\n<tr>\n<td>Parcel on its way</td>\n<td>No</td>\n<td>Address: ask us</td>\n<td>Accept the delivery, then use returns if needed</td>\n</tr>\n<tr>\n<td>Delivered</td>\n<td>No</td>\n<td>No</td>\n<td>Start a return within 60 days of delivery</td>\n</tr>\n</tbody>\n</table>\n<h2>11. Questions about cancelling and changing</h2>\n<h3>Can I change an order myself in My Account?</h3>\n<p>No. My Account shows your order details, but changes and cancellations are made by our support team. Email us with your order number so we can make the change for you.</p>\n<h3>I ordered for someone else. Who can ask for a change?</h3>\n<p>The person who placed the order, using the order number and the email used at checkout. If you are the recipient of a gift, ask the buyer to email us, so the request comes from the address on the order.</p>\n<h3>Can I add another item to an order I already placed?</h3>\n<p>Within 24 hours, email us and we will tell you whether it can be added to the same order. Placing a separate new order is often the quickest route, and shipping is free on that order too.</p>\n<h3>Can I change the shipping country?</h3>\n<p>Within 24 hours you can change the address to any address in the United States, Canada, Australia or New Zealand. We do not ship to other countries. For parcels to Canada, Australia and New Zealand, import duties or taxes depend on the destination country.</p>\n<h3>I sent my change request at hour 23. Does it count?</h3>\n<p>Yes. The 24-hour window is about when your email reaches us, based on the time on your order confirmation. Our reply may come later, within 24 hours on business days, and we handle the request you sent inside the window.</p>\n<h3>Can you show me a proof before printing?</h3>\n<p>No. There is no proof step before production. Use the live text preview on the product page to check your text, and use the 24-hour window if you need to correct it.</p>\n<h2>12. Contact us</h2>\n<p>Need to cancel or change an order? Email <a href=\"mailto:support@spurly.shop\">support@spurly.shop</a> or <a href=\"/submit-ticket/\">submit a ticket</a> with your order number. We reply within 24 hours on business days. Spurly, 18 Fletcher Drive, Montville, NJ 07045, US. You can also check an order on <a href=\"/order-tracking/\">Order Tracking</a> or browse the <a href=\"/faqs/\">FAQs</a>.</p>\n","visible_characters":10506,"meta_description":"Fix a ranch-name typo, swap a size or cancel a Spurly order within 24 hours of placing it. See how to ask, what can change and how refunds work for cancels.","parent":null,"published_at":"2026-11-17T04:17:36+00:00","updated_at":"2026-11-17T04:45:09+00:00"}}